
BIM Modeling
Project Date:
July 16, 2024
Project Duration:
12 hours / week
Category:
BIM Modeling
Client / Company:
Confidential
Project Location:
USA

How Can We Help
If you need any helps, please feel free to contact us.
3213488422
support.cds-aec.com

Project Information
This high-rise commercial tower project required an advanced BIM model to streamline architectural, structural, and MEP coordination. The goal was to create a LOD 400 model that could minimize design conflicts and optimize construction efficiency. By integrating 4D scheduling and 5D cost estimation, the project team ensured smooth execution with reduced material wastage.
The project also focused on sustainability and energy efficiency, incorporating solar shading analysis and thermal insulation strategies. Clash detection using Navisworks helped resolve over 150 design conflicts, leading to better coordination between architects, engineers, and contractors. This resulted in a 35% reduction in rework costs and improved project timelines.
Design Highlight
The BIM model was developed with detailed fabrication-level accuracy, ensuring seamless coordination between all trades. By integrating real-time data with digital twins, the team could visualize construction sequences and mitigate risks in advance. The use of parametric modeling allowed flexibility in design adjustments while maintaining compliance with regulatory standards. The project also leveraged energy modeling tools to enhance building efficiency and meet sustainability benchmarks.
LOD 400 BIM model with fabrication-ready details.
Clash-free coordination between architectural, structural, and MEP systems.
4D scheduling integration for precise construction sequencing.
Energy simulation analysis for sustainability and efficiency.
Real-time collaboration with cloud-based BIM tools.



